| 1. Fluid & system review | Identify oil, contamination symptoms and the system layout. | Oil grade, viscosity, temperatures, reservoir volume and service history. | Fluid and contamination-review scope. |
|---|
| 2. Method selection | Review offline filtration, flushing, element replacement and connections. | Required flow, pressure, cleanliness target and connection points. | Treatment method, equipment scope and filtration selection. |
|---|
| 3. Execution planning | Coordinate isolation, circulation and service access. | System schematic, downtime and operating restrictions. | Agreed flushing/filtration work sequence. |
|---|
| 4. Verification & prevention | Review samples, indicators and contamination-entry points. | Agreed sampling method and acceptance limits. | Cleanliness results and maintenance recommendations. |
|---|